Landslide protection works on the slope of Batiyeva Mountain on the corner of Lokomotyvna str. and Krasnodonska str. in Solomjanskyi District of Kyiv

Client: Municipal Enterprise “Kyivbudrekonstruktsiya”

Types of works performed:

  • construction of 3 retaining walls and a drainage system for drainage of rainwater;
  • territory landscaping

Project description. Over time and in connection with mass development, load on the slopes of Batiyeva Mt. increased significantly. This lead to the activation of landslide processes, the destruction of the brick retaining wall (built in the nineteenth century) and the exposure of main electric cables feeding the adjacent housing estate.

Due to timely execution of works on dismantling of the old retaining wall and drilling-in of 32 bored piles with a diameter of 620 mm, GARANTBUD LLC managed to significantly reduce the dynamics of the shifting process of Batyeva Mt.

Terms: end of 2018.